
Dholera Smart City Latest Development and Current Status 2025
Dholera Smart City refers to one of the latest greenfield smart city projects in Gujarat that connects Bhavnagar and Ahmedabad.
Dholera Smart City refers to one of the latest greenfield smart city projects in Gujarat that connects Bhavnagar and Ahmedabad. It is expected to stand out as an example for all the major smart cities of India. The Dholera smart city project is going to be the biggest greenfield project in Asia.
The speciality of the Dholera SIR Project is its non-polluted and clean ambiance. The total Dholera smart city project area encompasses 920 sq. km and offers immense growth and development possibilities including high-tech infrastructure, great connectivity, along with the overall sustainable development of the region including ample greenery all around.
The entire Dholera SIR area will be developed in different phases. Each phase will cater to the development of different activation area allocated to it. The phases are further broken down into six town planning schemes. The aim of the project is to fulfil the increasing need for homes that offer all amenities and are within a budget.
Dholera Smart City Current Status: When it’s done, Dholera will be the most modern and forward-thinking city in the country. But what does this new smart city mean? And what does its future look like? Here’s an overview of where Dholera is and where the project is going. The development of dholera happens in phases. The first phase is supposed to be done by the end of 2022, but it will be late because of the corona pandemic. The last phase will be done by 2042.
What is the current status of dholera smart city?
Currently, Dholera Smart City is in the process of being built. The first phase will be finished in 2022, and many big companies have been given land to build on. This will help the development of Dholera Smart City. An expressway project has also begun, and the government has been given the tender for an airport. Both of these projects will be finished by 2025-2026.
Some of the most well-known companies in the world that do work for DHOLERA SIR:
- Hal Crow’s “Master Plan” (UK)
- AECOM is a company that runs projects (USA)
- Information Technology and Communication: Wipro, IBM, and CISCO
- Larsen & Turbo ltd. is in charge of town planning, the sewage treatment plant, and the common effluent treatment plant.
- Water Treatment Plant – SPML – ABCD Building – Cube Construction Engineering Ltd.
- Landmark Development
- Infrastructure and connectivity on a world-class level (ICT Enabled)
- Central spine expressway (250 Meter Ahmedabad to Dholera SIR) and metro rail to connect SIR with Megacities.
- Dholera International Airport: 1426 hectares of land were chosen for the airport in the village of Navagam, tal. Dholera, dist. The Airports Authority made the Feasibility Report of India (AAI). PWC has already gotten all the permissions it needs (price Waterhouse coopers)
- Sea, air, rail, and a 250-meter express highway all connect.
Which Company Started Construction in Dholera?
ReNew Power and Chiripal Group, two of the five companies given land in the Dholera Special Investment Region (DSIR), have begun building their units, state government officials said on Friday, when Chief Minister Bhupendra Patel went to the project site to check on the progress.
The groundwork for two businesses has already been done. The head of government has seen this. Harriet Shukla, CEO of Dholera SIR, said, The planning is now being put into action on the ground.”
At Dholera SIR, ReNew Power has been given 100 acres of land for a plant that will do solar modules with a capacity of 2000 MW. Chiripal has been given 90 acres for a plant that will make aluminum foil and PET Resin. In the other three plots of land that have been given In Dholera SIR, Tata Chemicals Ltd is building a 10 GWh Li-ion battery plant on 126 acres, Hindustan Petroleum is building gas stations and charging stations for electric vehicles on three acres, and Torrent Power has built a power distribution network on six acres.
The official said that in the first phase, world-class infrastructure worth Rs 3,000 crore had been built in an area of 22.5 square kilometres. He said that 90% of the work was done on the activation area, which is a small part of the SIR and covers 920 square kilometres.
TATA Semiconductor Project: Tata Electronics breaks ground for Rs 91,000 crore semiconductor plant in Gujarat. n a historic moment for India, Tata Electronics Private Limited (TEPL) has carried out the groundbreaking of its Rs 91,000 crore semiconductor fabrication facility at the Dholera Special Investment Region (DSIR).
Prime Minister Narendra Modi laid the foundation stone for India’s first semiconductor fab virtually. Also present for the ceremony were Natarajan Chandrasekaran, Chairman of the Board of Tata Sons, Ashwini Vaishnaw, Minister of the Ministry of Electronics & IT and Bhupendra Patel, Chief Minister of Gujarat. Rajeev Chandrasekhar, Minister of State, Ministry of Electronics and IT also joined the ceremony virtually.
Industries in Dholera Smart City:
Some of the most important industries that will be in the Dholera smart city,
- Electronics
- Aviation
- Auto and ancillaries to Auto
- Heavy engineering
- Defense
- High-tech emerging technologies
- General Manufacturing
- Agro and food processing
- Pharmaceuticals and Biotechnology
- Metals and metallurgical products
Dholera Smart City – Area Divisions
The Dholera Smart City is split up into different areas with their benefits. So, if you want to live smart, you can depend on good planning. Here’s what’s on the list:
- City Center
- 250 Meter Expressway
- Sports Zone
- Knowledge & IT Zone
- Green Zone
- High Access Corridor
When will the project completed?
Phase 1 of the Dholera smart city is expected to be finished in the middle of 2022, But there is still no date for when it will be finished. Also, it might take longer to finish the project as a whole. ABCD Enclave and ABCD Greens are two important projects in Phase 1. Phases 2 and 3 will be done by 2030, and Phases 4 and 5 will be done by 2042.
Conclusion:
Dholera smart city is the government of India’s dream project. This township would be a wonderful region in India’s heart, with numerous advanced technological cities and services. Only sophistication will surround you when staying in such a high-standard city, whether residential, industrial, or commercial. Furthermore, the Gujarat government has made significant contributions in this field.